en:robotina_charger:commissioning
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| en:robotina_charger:commissioning [2022/12/09 09:16] – [Configuration] gdzampo | en:robotina_charger:commissioning [2022/12/22 09:27] (current) – removed gdzampo | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| - | ====== Commissioning ====== | ||
| - | Strictly follow [[en: | ||
| - | |||
| - | ===== Mounting ===== | ||
| - | |||
| - | Mount Robotina charger (EVSE), PM1-E-D & PM3-E-D power sensors as well as wireless modbus WM-1 & relay WR-1 to a suitable place. For more details, please read here [[en: | ||
| - | |||
| - | ===== Wiring ===== | ||
| - | |||
| - | Connect EVSE to the home LAN. Wire WM-1 module with power sensor and WR-1 relay with device (e.g. heat pump, el. radiator). | ||
| - | |||
| - | |||
| - | |||
| - | ===== Configuration===== | ||
| - | |||
| - | |||
| - | Install and run [[en: | ||
| - | 1. For adding or removing power sensor please see [[en: | ||
| - | 2. How to connect PV SolarEdge inverter please see [[en: | ||
en/robotina_charger/commissioning.1670577373.txt.gz · Last modified: by gdzampo